1
/
of
2
1
item left in stock.
FOR HIRE - 30kg Sunmix Top Line Spiral Dough Mixer
FOR HIRE - 30kg Sunmix Top Line Spiral Dough Mixer
£600.00 GBP
ex VAT
£720.00 GBP
inc VAT
ex VAT
inc VAT
£600.00 GBP
ex VAT
£720.00 GBP
inc VAT
£0.00
ex VAT
inc VAT
Shipping calculated at checkout.
Couldn't load pickup availability
Expected Delivery By:



Cost Breakdown
-
Initial Hire Package:
- £200 covers shipping (both ways)
- Includes a 2-week hire period
-
Extended Hire:
- Additional weeks are charged at £200 per week
Machine Options
- Capacity: 30kg
Purchase Option
We often send a brand new machine. At the end of your hire period, you have the option to purchase it by simply paying the remaining balance. If you decide not to purchase, just contact us to collect the machine.
For more details or to discuss your requirements, please call us.
Standard Spec
- Top Line or Smart Line machine
- 30kg DOUGH CAPACITY
- 230V SINGLE PHASE
- MANUAL CONTROLS
- VARIABLE SPEED CONTROL 50-300RPM
- 60%-100% hydration
- Manual timer as standard - On/Off/Timer
- Standard 3 pin G Type UK plug installed.
Electrics
- Type B or C RCBO required suitable for inverter machines.
Machine Hire Terms and Conditions
1. Hire Duration:
- The machine is available for 14 days from the date of delivery unless agreed otherwise.
- Example: If received on 1st June, it must be secured, wrapped, and ready for collection by 16th June.
2. Condition on Return:
- The machine must be returned clean. A £45 cleaning fee will apply if not cleaned properly.
- Normal wear and tear is acceptable.
- Any damage caused by misuse will be charged. Photos and videos are taken before dispatch, and we recommend you document the machine upon arrival.
3. Hire Extensions:
- If you wish to extend your hire, please contact us as soon as possible.
- It is your responsibility to inform us at the end of the hire period to arrange return or request an extension.
- Failure to do so will extend your hire into additional weeks, charged at the weekly rate.
4. Weekly Charging Policy:
- Hire is charged per full week. Partial weeks (e.g., 3 extra days) will still incur a full week’s charge.
5. Return Packaging:
- The machine must be secured to its original pallet using a ratchet strap and packaged in its original materials.
6. New Customers:
- First-time customers must provide their business name, company number, and a valid form of ID before dispatch.
Downloads
Share

